A construction crew needs to build a road that will be 20 miles long. The crew already completed a stretch that is 6.44 miles long and another that is 8.62 miles long. How much more road does the construction crew need to build?
(1) Answers
20 - (6.44 + 8.62) = 5.14 miles
Add answer
Sign in
Sign up